Design/Build

History

The design/build delivery system often cites the original "Master Builder" model used to build most pre-modern projects. Under the Master Builder approach, a central figure of the architect held total project accountability. From inception to completion, the master builder was the key organizational figure and strictly liable to the owner for defects, delays, and losses. The design/build system is a return to some of the fundamentals of the Master Builder approach.


Overview of process

Design-build focuses on combining the design, permit, and construction schedules in order to streamline the traditional design-bid-build environment. This does not shorten the time it takes to complete the individual tasks of creating construction documents (working drawings and specifications), acquiring building and other permits, or actually constructing the building. Instead, a design-build firm will strive to bring together design and construction professionals in a collaborative environment to complete these tasks at the same time.

Typically the hallmark of a Design/Build project is that one organization is responsible for both design and construction of the project. If this organization is a contractor, the process is known as "Contractor-led Design-Build". If the organization is a design firm, the process is known as "Design-led Design-Build". In either case, the organization employed by the owner rarely handles both aspects of design and construction in-house. In fact, the organization often subcontracts with on-site personnel (if design-led) as well as architects and engineers (if contractor-led).

"...strategic focus of activities, to control cost, schedule and quality.."